Train for several things at once.
Pick every goal you have and one to lead with. Axial fits them all into one week.
These are a few of them. Choose one to see a real week and a session.
Squat, bench, deadlift and press in blocks that build from week to week.


Sample athlete with a 315 lb squat max. The back squat is 4×8 at 210 lb, 67% of it.
Weekly volume for every muscle, trained close to failure, with the areas you want to bring up getting extra.


Sample athlete with a 205 lb bench and shoulders and triceps as focus areas. They get extra sets, and accessories come paired as supersets.
From 5K to marathon: easy runs, intervals, tempo work and the long run.


Sample athlete with a 22:30 5K. The 30/30s are run at 6:41 to 6:47 a mile.
Intervals in power zones and long rides, spaced around your hard days.


Sample athlete with a 260 W FTP. The sweet-spot blocks are 221 to 234 W.
Pool sets from easy aerobic work to hard repeats.


Sample athlete with a 1:40 per 100 m threshold. The pyramid is swum at 1:41 per 100 m.
Swim, bike and run in one week, with brick sessions.


Sample athlete with a 22:30 5K, a 250 W FTP and a 1:45 per 100 m threshold. The bike pyramid is 220 to 235 W.
Division weights, compromised running and the strength work behind them.


Sample athlete in Men Open. Sled push is 335 lb and sled pull is 225 lb, each after a 1 km run.
Intervals, metcons and mixed aerobic work.


A metcon is three rounds of 40 seconds on and 20 off, with loads set for you.
Racing? Add the date and the plan counts back from it: base, build, peak, taper. Want a set block? Choose the number of weeks. Neither? It keeps going, with deloads built in.




